• 语言选择:
  • 中文版
  • English
您的位置:首 页 > 新闻中心 > FAQ > How to install the iron core winding machine?

FAQ

How to install the iron core winding machine?

发布时间:2021-11-20 16:06:32  浏览量:18

How to install the iron core winding machine?
1: After the iron core winder machine is moved to the position, adjust the anchor bolts at all places. After the rubber pad is put on, the wheels leave the ground, the leveler corrects the machine table, the panel remains flat, the ground is relatively vertical, and lock the nuts of the anchor bolts.
2: Tear off the adhesive tape and ropes fixed in various places and do not connect to the power supply of the iron core winding machine.
3: Open the power box of the iron core winding machine, check the accessories and contacts of the socket, and determine if there is any looseness.
4: Confirm whether there is any moisture in the electrical accessories, handle it in a timely manner, and ensure good insulation.
5: Check if there is any looseness in the pneumatic magnetic switches.
6: Check all wiring terminals and tighten the screwdriver to ensure good contact.
7: Apply 40% engine oil to each sliding part on the machine.
8: The premise of connecting the iron core winding machine to the power supply is to ensure that the machine is well grounded. After connecting the power supply, first check the leakage protection function, close the typical leakage protection circuit breaker, press the experimental button, and the circuit breaker also needs to be short circuited for protection. Ensure that the power supply voltage is correct, otherwise the machine will be damaged.
9: After the core winder is connected to the source, adjust the inlet pressure regulating valve of the machine to ensure the air pressure is 0.5~0.7MPa.


该如何安装铁芯卷绕机?

导航栏目

联系我们

深圳市众维德电气设备有限公司
联系人:李先生

24小时服务热线:13670044401

电话:0755 2880 1991

邮箱:szwade@163.com

地址:深圳市坪山区坑梓街道金康路54号A区